Solution to culvert installation challenges

       

During the assembly of a 140m long 6.3m span 4.2 rise aluminium multi-plate culvert, Katalin was part of a team who was called on to provide a solution to assembly challenges and played a key role in developing a solution for the problematic section. This enabled the successful completion of the structure and avoided significant financial consequences for the project. Project done while working for CSP Pacific.

Technical solution to installation challenges Technical solution to installation challenges Troubleshooting of manufactured and supplied product installation challenges Troubleshooting of manufactured and supplied product installation challenges Troubleshooting of fabricated and supplied product installation challenges Troubleshooting of fabricated and supplied product installation challenges Troubleshooting of fabricated and supplied product installation challenges Troubleshooting of fabricated and supplied product installation challenges